19
Comprehension check
[Installation]
• What is the minimum size of shop entrance so that you can carry a machine without
removing the table?
• Do you understand what kinds of packing parts there are?
• Do you understand the places of angle brackets and units to be installed?
• Do you understand that the specification of language can be changed?
• Do you understand how to measure the ground resistance?
• Did you understand how to adjust the jack bolt on the bottom side of the dryer rack?
• Did you understand the location of the Leak Circuit Breaker and the function?
33_4
4160
[Question]
• The shop owner said to you “Move a machine so that the back side of machine is as close as
possible to the wall”,What should you do?
• What packing item should be attached to a machine?
• Where are the angle brackets?
• For the availability of Spanish or French, what should you do?
• Do you measure the grounding resistance of the S-2 and the PP after you connect LVDS
between S-2 and CS, and between CS-1 and LP? Or do you measure it before you connect them?